  • Planning Permission Guide May 2024

    The planning permission process is critical to any construction or development project, as it ensures that proposed developments align with local planning policies and regulations. Understanding the intricacies of this process is essential for anyone embarking on a project that requires planning permission. This blog post aims to provide a comprehensive overview of the planning permission process, covering everything from the initial need for planning permission to the final decision-making and appeal stages.

    The importance of understanding the planning permission process cannot be overstated. Navigating the various steps and requirements can be daunting, but with the right knowledge and guidance, the process can be navigated effectively. This blog post will cover the key stages of the planning permission process, drawing from the experiences and resources of local planning authorities to provide a thorough and practical guide.

    By the end of this article, readers will have a firm grasp of the planning permission process, including when planning permission is required, how to engage with the local planning authority, the steps involved in submitting an application, the decision-making process, and the options for appealing a decision. Additionally, the blog will touch on the emerging considerations around sustainable development and net-zero requirements, which are increasingly shaping the planning landscape.

    Understanding the Need for Planning Permission

    Understanding the Need for Planning Permission

    Planning permission is a crucial step in the development process, as it ensures that proposed projects adhere to local planning policies and regulations. Understanding when planning permission is required and the specific criteria for determining if a proposal needs it is essential for ensuring a smooth and successful project.

    Planning permission is a crucial step in the development process, as it ensures that proposed projects adhere to local planning policies and regulations. Understanding when planning permission is required and the specific criteria for determining if a proposal needs it is essential for ensuring a smooth and successful project.

    Planning permission is generally required for any development or change of use of land or buildings, with some exceptions. The need for planning permission is typically determined by the type and scale of the proposed project, as well as its potential impact on the surrounding area. Some common situations where planning permission is required include:

    Planning permission is generally required for any development or change of use of land or buildings, with some exceptions. The need for planning permission is typically determined by the type and scale of the proposed project, as well as its potential impact on the surrounding area. Some common situations where planning permission is required include:

    1. New Construction:New Construction: Any new buildings or structures, including houses, extensions, and commercial premises, generally require planning permission.

      • Alterations and Renovations: Significant alterations to existing buildings, such as extensions, loft conversions, or changes to the external appearance, often require planning permission.
        • Change of Use: Changing the use of a building or land, such as converting a residential property into a commercial premises or vice versa, typically requires planning permission.
        • Any development or change of use of land or buildings requires planning permission, with some exceptions. The need for planning permission is typically determined by the type and scale of the proposed project, as well as its potential impact on the surrounding area.
        • Any new buildings or structures, including houses, extensions, and commercial premises, generally require planning permission.
        • Significant alterations to existing buildings, such as extensions, loft conversions, or changes to the external appearance, often require planning permission.
        • Changing the use of a building or land, such as converting a residential property into a commercial premises or vice versa, typically requires planning permission.
        • Demolition: The demolition of certain buildings or structures, particularly those with historic or architectural significance, may require planning permission.
        • Certain Permitted Development Rights: Even if a project falls under "permitted development" and does not require full planning permission, there may be specific criteria and limitations that must be met.
        • To determine if a proposed project requires planning permission, it is essential to consult with the local planning authority. They can provide guidance on the specific requirements and any relevant exemptions or permitted development rights that may apply. Additionally, many local planning authorities offer pre-application advice services, which can help identify potential issues and ensure that the planned development is likely to be approved.

          By understanding the need for planning permission and the associated requirements, property owners, developers, and professionals can better navigate the planning process and increase the chances of a successful project outcome.

          The Pre-Application Stage

          Engaging with the local planning authority is a crucial first step in the planning permission process. Before submitting a formal planning application, it is highly recommended to seek advice and guidance from the local planning authority. This pre-application stage can provide valuable insights and help streamline the application process.

          Engaging with the local planning authority is a crucial first step in the planning permission process.

          Before submitting a formal planning application, it is highly recommended to seek advice and guidance from the local planning authority.

          This pre-application stage can provide valuable insights and help streamline the application process.

          One of the key aspects of the pre-application stage is engaging with the duty planner.

          The duty planner is a planning officer who is available to provide advice and guidance on various planning matters.

          They can offer valuable insights into the specific requirements and considerations for a proposed development, helping applicants understand the local planning policies and regulations that may apply.

          During the pre-application stage, the duty planner can provide:

          1. Advice on the need for planning permission: The duty planner can help determine whether a proposed development requires planning permission or if it falls under permitted development rights.

          Guidance on the local information requirements list: The local planning authority will have a list of the information and documents that need to be submitted with a planning application.

          The duty planner can provide guidance on the specific requirements and ensure the applicant is aware of all the necessary information to be included.

          Feedback on the proposal: The duty planner can review the initial plans and provide feedback on the proposed development.

          Highlighting any potential issues or areas of concern that should be addressed before submitting the formal application.

        • Advice on the planning application process: The duty planner can explain the various stages of the planning application process, including the consultation and decision-making procedures, and provide guidance on navigating these steps effectively.
        • By engaging with the local planning authority during the pre-application stage, applicants can gain a better understanding of the planning requirements, identify any potential issues or challenges early on, and ensure their proposal aligns with the local planning policies and regulations.

        • Advice on the planning application process: The duty planner can explain the various stages of the planning application process, including the consultation and decision-making procedures, and provide guidance on navigating these steps effectively.
        • By engaging with the local planning authority during the pre-application stage, applicants can gain a better understanding of the planning requirements, identify any potential issues or challenges early on, and ensure their proposal aligns with the local planning policies and regulations.

        • The pre-application advice service may also include a meeting with the planning officer to discuss the proposal in person and address any specific concerns or questions.
        • This proactive approach can significantly improve the chances of a successful planning application and streamline the overall process.

          Submitting the Planning Application

          Preparing and Submitting the Planning Application

          Preparing the Application

          The first step in submitting a planning application is to ensure you have all the necessary information and documents ready.

          1. Completing the relevant application form: You’ll need to fill out the correct application form, which can vary depending on the type of development you’re proposing. These forms are usually available on the local planning authority’s website or through the Planning Portal.
          • Providing supporting documents: Along with the application form, you’ll need to submit a range of supporting documents that provide detailed information about your proposal. This can include site plans, elevations, floor plans, design and access statements, and any other relevant information required by the local planning authority.
          • Preparing detailed plans and drawings: Accurate and detailed plans and drawings are essential for the local planning authority to understand the nature and scale of your proposed development. These should include site plans, floor plans, elevations, and potentially 3D visualizations or models.

          Preparing detailed plans and drawings: Accurate and detailed plans and drawings are essential for the local planning authority to understand the nature and scale of your proposed development. These should include site plans, floor plans, elevations, and potentially 3D visualizations or models.

        • Gathering relevant reports and assessments: Depending on the nature and scale of your proposal, you may need to submit additional reports and assessments, such as a transport statement, flood risk assessment, or ecological survey.
        • Calculating and paying the application fee: All planning applications require a fee, which is set by the government and varies depending on the type of development. You’ll need to calculate the correct fee and include payment with your application.
        • Submitting the Application

          Once you have all the necessary information and documents prepared, you can submit your planning application. This is typically done through the Planning Portal, which is the national online application system used by most local planning authorities.

          The process of submitting your application through the Planning Portal involves:

          1. Registering for an account (if you don’t already have one)

          2. Selecting the appropriate application form and filling it out

          3. Uploading all the required supporting documents

          4. Paying the application fee

          It’s important to check the specific requirements and procedures of the local planning authority where your development is proposed.

          After submitting your application, the local planning authority will acknowledge receipt and begin the validation process, which ensures that the application is complete and compliant with the necessary requirements.

          The Validation Process

          The validation process is a critical step in the planning application journey, ensuring that the submitted application is complete and compliant with local and national planning requirements.

          The validation process typically involves the following steps:

          Validation and Acknowledgement of the Application

          When an application is received, the local planning authority will first validate and acknowledge its receipt. This involves checking that the application form has been correctly filled out, that all the required supporting documents have been provided, and that the appropriate application fee has been paid.

          Ensuring the Application is Complete and Compliant

          During the validation stage, the planning authority will review the application to ensure that it meets all the necessary requirements. This may involve checking that the site location plan, floor plans, elevations, and other technical drawings are accurate and up-to-date. The authority will also assess whether the application complies with relevant planning policies, regulations, and local information requirements.

          If the application is deemed incomplete or non-compliant, the planning authority will notify the applicant and request the missing information or clarification. The applicant will then have an opportunity to address the issues and resubmit the application.

          Timely Validation and Acknowledgement

          The planning authority is required to validate and acknowledge the receipt of a planning application within a reasonable timeframe, typically within 5 working days. This ensures that the application can progress to the next stage of the process without undue delay.

          Importance of a Thorough Validation Process

          The validation process is crucial in ensuring that planning applications are properly prepared and comply with the necessary requirements. A comprehensive and efficient validation process helps to streamline the subsequent stages of consultation, assessment, and decision-making, leading to a more effective and transparent planning system.

          By understanding the validation process and the importance of submitting a complete and compliant application, applicants can increase the likelihood of a successful planning outcome and minimize the risk of delays or complications during the application process.

          Consultation and Notification

          Consultation and Notification

          The planning application process involves a crucial step of consultation and notification, where the local planning authority ensures that the public and relevant stakeholders have the opportunity to provide their feedback and comments on the proposed development.

          Once a planning application has been submitted and validated, the local planning authority will typically undertake a consultation process, informing the public and statutory consultees about the proposed development. This consultation period, which is often a minimum of 21 days, aims to give interested parties the chance to voice their opinions and concerns regarding the application.

          The methods of consultation and notification can vary, but they often include:

          1. Public Notices: The local planning authority will publish a notice in a local newspaper, providing details of the application and inviting comments from the public.
            • Site Notices: A site notice will be displayed on or near the application site, informing passers-by of the proposed development and the opportunity to comment.
        • Neighbor Notification: The local planning authority will notify the owners or occupiers of properties adjacent to or in close proximity to the application site, inviting them to comment on the proposal.
        • Consultation with Statutory Consultees: The local planning authority will consult with various statutory consultees, such as utility companies, environmental agencies, and other relevant authorities, seeking their expert opinions and any potential concerns.
        • Online Publication: Details of the planning application, including plans and supporting documents, will be published on the local planning authority’s website, allowing the public to view and comment on the proposal.
        • During the consultation period, members of the public and other interested parties can submit their comments, observations, and objections to the local planning authority. These comments will be carefully considered by the case officer responsible for assessing the planning application.

          The consultation process serves several important purposes:

        • Transparency and Engagement: It allows the local community to be informed about and participate in the planning process, fostering transparency and engagement.
        • Identification of Potential Issues: The consultation process helps local planning authorities identify potential issues, concerns, or impacts associated with proposals.
          • Informed Decision-Making: Feedback from the consultation process provides valuable information to local planning authorities, enabling them to make informed and balanced decisions on planning applications.
          • The consultation and notification stage is a critical component of the planning application process, ensuring that the public and relevant stakeholders have a voice in the decision-making process and that local planning authorities can consider a range of perspectives before reaching a final determination.

            Site Visit and Assessment

            The site visit and assessment stage of the planning application process is a crucial step in the decision-making process. During this stage, the case officer visits the site to gather firsthand information and gain a deeper understanding of the proposed development.

            The role of the case officer is multifaceted. They evaluate the planning application, considering all relevant factors and ensuring that the proposal aligns with local and national planning policies and regulations. The case officer’s assessment involves a thorough review of the application, including supporting documents and any additional information provided by the applicant.

            The role of the case officer is multifaceted. They are tasked with carefully evaluating the planning application, considering all relevant factors and ensuring that the proposal aligns with local and national planning policies and regulations.

            One of the primary objectives of the site visit is to assess the physical characteristics of the site and its surroundings. The case officer will examine the site’s location, topography, and any existing structures or features that could be impacted by the proposed development. This on-site evaluation allows the case officer to better understand the context in which the development is being proposed and how it might fit into the local environment.

            One of the primary objectives of the site visit is to assess the physical characteristics of the site and its surroundings. The case officer will examine the site’s location, topography, and any existing structures or features that could be impacted by the proposed development. This on-site evaluation allows the case officer to better understand the context in which the development is being proposed and how it might fit into the local environment.

            During the site visit, the case officer will also consider the potential impacts of the proposed development, such as its effect on the character and appearance of the area, any impacts on neighboring properties, and any potential issues related to access, parking, or traffic. The case officer may also consult with other relevant authorities, such as highways or environmental agencies, to gather additional information and input.

            During the site visit, the case officer will also consider the potential impacts of the proposed development, such as its effect on the character and appearance of the area, any impacts on neighboring properties, and any potential issues related to access, parking, or traffic. The case officer may also consult with other relevant authorities, such as highways or environmental agencies, to gather additional information and input.

            The assessment process involves a careful balancing of various factors, including the applicant’s aspirations, the concerns and feedback of local residents and stakeholders, and the broader policy objectives and priorities of the local planning authority. The case officer must weigh these considerations and make a recommendation to the decision-makers, whether it be the local planning authority’s delegated decision-maker or the relevant planning committee.

            The assessment process involves a careful balancing of various factors, including the applicant’s aspirations, the concerns and feedback of local residents and stakeholders, and the broader policy objectives and priorities of the local planning authority.

            The case officer must weigh these considerations and make a recommendation to the decision-makers, whether it be the local planning authority’s delegated decision-maker or the relevant planning committee.

            In some cases, the case officer may identify the need for additional information or clarification from the applicant. In such instances, the case officer will work closely with the applicant to ensure that the necessary information is provided, enabling a more comprehensive and informed assessment of the proposal.

            In some cases, the case officer may identify the need for additional information or clarification from the applicant. In such instances, the case officer will work closely with the applicant to ensure that the necessary information is provided, enabling a more comprehensive and informed assessment of the proposal.

            The site visit and assessment stage is a critical component of the planning application process, as it allows the local planning authority to gain a deeper understanding of the proposed development and its potential impacts.

            This understanding, combined with the input from the public and other stakeholders, informs the final decision on the planning application, ensuring that it is made with the best interests of the local community and the broader public in mind.

            The Decision-Making Process

            The decision-making process in the planning application system is a critical stage that determines the final outcome of a development proposal.

            This stage involves several key elements that ensure a fair and transparent decision-making process.

            Timescales for Decision-Making

            Once a planning application has been validated and deemed complete, the local planning authority is subject to statutory time limits for making a decision. These time limits are set out in the Town and Country Planning (Development Management Procedure) (England) Order 2015 (as amended). The statutory time limits are:

            – 13 weeks for major development applications

            – 13 weeks for major development applications

            – 10 weeks for applications for technical details consent and applications for public service infrastructure development

            – 10 weeks for applications for technical details consent and applications for public service infrastructure development

            – 8 weeks for all other types of development (unless the application is subject to an Environmental Impact Assessment, in which case a 16-week limit applies)

            – 8 weeks for all other types of development (unless the application is subject to an Environmental Impact Assessment, in which case a 16-week limit applies)

            If the local planning authority fails to determine an application within the statutory time limit, and no extension of time has been agreed with the applicant, the applicant has the right to appeal to the Secretary of State against the non-determination of the application. Additionally, if the application remains undetermined after 26 weeks for major applications or 16 weeks for non-major applications, and no extension of time has been agreed, the applicant is entitled to a refund of the planning application fee.

            If the local planning authority fails to determine an application within the statutory time limit, and no extension of time has been agreed with the applicant, the applicant has the right to appeal to the Secretary of State against the non-determination of the application. Additionally, if the application remains undetermined after 26 weeks for major applications or 16 weeks for non-major applications, and no extension of time has been agreed, the applicant is entitled to a refund of the planning application fee.

            Delegated Decisions and Referrals to Planning Committees

            Delegated Decisions and Referrals to Planning Committees

            Most planning decisions are made by the local planning authority’s planning officers under delegated powers.

            These delegated decisions are made in accordance with the authority’s adopted scheme of delegation.

            Applications that are likely to be more contentious or have a significant impact on the local area are typically referred to the planning committee for determination.

            The planning committee is typically made up of elected councillors who represent the local community.

            When making a decision on a planning application, the local planning authority must have regard to the relevant development plan policies, any other material considerations, and the provisions of the National Planning Policy Framework (NPPF).

            Some of the key factors that are typically considered in the decision-making process include:

            – The proposed use of the land or building and its compatibility with the surrounding area

            The proposed use of the land or building and its compatibility with the surrounding area

            The design, scale, and appearance of the proposed development

            The impact on the character and appearance of the local area

            The impact on the character and appearance of the local area

            The impact on residential amenity, such as privacy, overlooking, and overshadowing

            The impact on residential amenity, such as privacy, overlooking, and overshadowing

            The impact on highways, traffic, and parking

            The impact on highways, traffic, and parking

            The impact on the natural environment, including protected species and habitats

            The impact on the natural environment, including protected species and habitats

            The provision of affordable housing, where applicable

            The provision of affordable housing, where applicable

            The potential for the development to contribute to the local economy and job creation

            The potential for the development to contribute to the local economy and job creation

            The decision-making process aims to balance these various factors and ensure that the proposed development is in the public interest and in accordance with the statutory development plan and other material considerations.

            The decision-making process aims to balance these various factors and ensure that the proposed development is in the public interest and in accordance with the statutory development plan and other material considerations.

            Conditions and Obligations

            The planning application process does not end with the decision-making stage. Even after a planning permission has been granted, there are additional considerations and requirements that the applicant must fulfil. These include the conditions attached to the planning permission and any community infrastructure levy (CIL) or planning obligations that may be required.

            The planning application process does not end with the decision-making stage. Even after a planning permission has been granted, there are additional considerations and requirements that the applicant must fulfil. These include the conditions attached to the planning permission and any community infrastructure levy (CIL) or planning obligations that may be required.

            Conditions Attached to Planning Permissions

            Time Limits: Conditions may be imposed to limit the time within which the development must commence or be completed.

            Approved Plans and Documents: Conditions can specify that the development must be carried out in accordance with the approved plans and supporting documents submitted with the application.

            Materials and Design: Conditions may require the use of particular materials or design features to ensure the development is in keeping with the local character and context.

            Environmental Considerations: Conditions can address environmental concerns, such as noise, air quality, biodiversity, or flood risk, and require the implementation of mitigation measures.

            Pre-Commencement Requirements: Conditions may require the submission and approval of additional details or information before the development can commence, such as a construction management plan or landscaping scheme.

            Occupancy and Use Restrictions: Conditions can limit the use of the development or place restrictions on occupancy, such as limiting the number of residential units or prohibiting certain commercial activities.

            Occupancy and Use Restrictions

            Conditions can limit the use of the development or place restrictions on occupancy, such as limiting the number of residential units or prohibiting certain commercial activities.

            Compliance with these conditions is crucial, as failure to adhere to them can lead to enforcement action by the local planning authority. Applicants should carefully review and understand the conditions attached to their planning permission, and ensure that they are addressed throughout the development process.

            Compliance with these conditions is crucial, as failure to adhere to them can lead to enforcement action by the local planning authority. Applicants should carefully review and understand the conditions attached to their planning permission, and ensure that they are addressed throughout the development process.

            Community Infrastructure Levy (CIL) and Planning Obligations

            Community Infrastructure Levy (CIL) and Planning Obligations

            In addition to conditions, the local planning authority may also require the applicant to make financial contributions or enter into planning obligations, known as Section 106 agreements. These obligations are intended to mitigate the impact of the development and ensure that the necessary infrastructure and services are provided to support the new development.

            In addition to conditions, the local planning authority may also require the applicant to make financial contributions or enter into planning obligations, known as Section 106 agreements. These obligations are intended to mitigate the impact of the development and ensure that the necessary infrastructure and services are provided to support the new development.

            The Community Infrastructure Levy (CIL) is a charge that local authorities can impose on new development to help fund infrastructure projects, such as schools, transport improvements, or community facilities. The CIL is calculated based on the size and type of the development and is payable upon commencement of the development.

            The Community Infrastructure Levy (CIL) is a charge that local authorities can impose on new development to help fund infrastructure projects, such as schools, transport improvements, or community facilities. The CIL is calculated based on the size and type of the development and is payable upon commencement of the development.

            Planning Obligations

            Planning obligations, on the other hand, are bespoke agreements negotiated between the local planning authority and the applicant. These obligations can take various forms, such as:

          • Affordable Housing: Requiring the provision of a certain percentage of affordable housing units within the development.
          • Financial Contributions: Requiring the applicant to make financial contributions towards the provision of infrastructure, such as public open spaces, education, or transportation.
          • In-Kind Contributions: Requiring the applicant to provide or fund the delivery of specific infrastructure or services, such as the construction of a new road or the provision of a community facility.
          • Monitoring and Reporting: Requiring the applicant to monitor and report on the development’s impact or the effectiveness of the mitigation measures put in place.
          • The specific CIL and planning obligation requirements will depend on the local planning authority’s policies and the nature and scale of the proposed development. Applicants should engage with the local planning authority early in the process to understand the potential CIL and planning obligation requirements and factor them into the overall project costs and viability.

            Compliance with the conditions and obligations attached to a planning permission is crucial, as failure to meet these requirements can lead to enforcement action, delays, or even the revocation of the planning permission. Applicants should work closely with the local planning authority throughout the development process to ensure that all conditions and obligations are addressed in a timely and satisfactory manner.

            Compliance with Planning Permissions

            Compliance with the conditions and obligations attached to a planning permission is crucial, as failure to meet these requirements can lead to enforcement action, delays, or even the revocation of the planning permission. Applicants should work closely with the local planning authority throughout the development process to ensure that all conditions and obligations are addressed in a timely and satisfactory manner.

            Appeals and Call-Ins

            The planning permission process does not end with the initial decision made by the local planning authority. Applicants have the right to appeal a planning decision, and there are also instances where the decision can be ‘called-in’ by the Secretary of State for further consideration.

            The Right to Appeal a Planning Decision

            If an applicant is dissatisfied with the decision made by the local planning authority, they have the right to appeal the decision to the Secretary of State. This appeal process provides an opportunity for the applicant to have the decision reviewed by an independent body, which can either uphold the original decision or overturn it.

            Grounds for Appealing a Planning Decision

            The grounds for appealing a planning decision can vary, but they typically include:

            • Refusal of planning permission
            • Conditions attached to a planning permission
            • Non-determination of a planning application within the statutory time limits

            The appeal process is governed by specific timescales and requirements, which the applicant must adhere to. For example, an appeal against a refusal of planning permission must be submitted within six months of the date of the decision letter.

            The appeal process is governed by specific timescales and requirements, which the applicant must adhere to. For example, an appeal against a refusal of planning permission must be submitted within six months of the date of the decision letter.

            The Secretary of State will then appoint a Planning Inspector to review the case. The Inspector will consider the original application, the reasons for the local planning authority’s decision, and any new evidence or arguments presented by the applicant. They may also conduct a site visit and hold a hearing or public inquiry, depending on the complexity of the case.

            The Planning Inspector will then make a recommendation to the Secretary of State, who will ultimately decide whether to uphold or overturn the original decision. This decision by the Secretary of State is final and binding, unless challenged through a judicial review process.

            The Call-In Process

            In addition to the right of appeal, the Secretary of State also has the power to ‘call-in’ a planning application for their own determination. This means that the Secretary of State can choose to make the final decision on a planning application, rather than leaving it to the local planning authority.

            The Secretary of State will only exercise this power in certain circumstances, which are set out in national planning guidance. These include cases where the proposed development:

            • Could have a significant impact beyond the immediate locality
            • Raises issues of national security
            • Involves a conflict with national policies on important matters
            • Could have significant effects beyond their immediate locality
            • If the Secretary of State decides to call-in a planning application, they will then appoint a Planning Inspector to hold a public inquiry and make a recommendation on the decision. The Secretary of State will then make the final decision, which again is binding unless challenged through a judicial review.

              The call-in process is relatively rare, but it can be a powerful tool for the government to intervene in local planning decisions that have wider implications or raise significant national issues.

              In summary, the planning permission process does not end with the initial decision by the local planning authority. Applicants have the right to appeal a decision, and in certain circumstances, the Secretary of State can choose to call-in an application for their own determination. These mechanisms provide an important check and balance on the planning system, ensuring that decisions are made fairly and in accordance with national planning policies and priorities.

              The Role of Elected Members

              The involvement of elected members or councillors in the planning application process is crucial in ensuring fairness and transparency in the decision-making process.

              As representatives of the local community elected members play a vital role in voicing the concerns and interests of their constituents.

              One of the primary responsibilities of elected members is to act as a liaison between the local authority and the communities they serve.

              This entails attending local meetings engaging with residents and advocating for their interests during the planning process.

              Elected members can raise awareness of proposed developments gather public feedback and ensure that the local planning authority is aware of the community’s perspectives and concerns.

              In the decision-making stage elected members may be involved in the planning committee’s deliberations where they have the opportunity to scrutinize the application consider the relevant planning policies and material considerations.

              They have the opportunity to ultimately vote on the outcome ensuring that the decision-making is not solely in the hands of officers but is subject to the oversight and input of elected representatives.

              It is essential for elected members to maintain an open mind when considering planning applications and base their decisions on material planning considerations rather than personal or political motivations.

              They must also adhere to the local authority’s code of conduct which sets out the standards of behavior expected from elected officials.

              Elected members must maintain an open mind when considering planning applications and base their decisions on material planning considerations, rather than personal or political motivations. They must also adhere to the local authority’s code of conduct, which sets out the standards of behavior expected from elected officials.

              Section 25 of the Localism Act 2011 clarifies that a member is not to be regarded as being unable to act fairly or without bias based on having expressed a view on the matter unless the circumstances indicate that the member has a closed mind.

              By ensuring the involvement of elected members in the planning process, the decision-making process becomes more transparent and accountable to the local community. This helps to foster a sense of trust and confidence in the planning system and ensures that the community’s needs and priorities are given due consideration.

              Overcoming Challenges

              The planning permission process can often involve navigating complex and contentious applications, where various factors must be carefully considered and balanced. In such situations, it is crucial for local planning authorities to have robust strategies and procedures to address the challenges that may arise.

              One of the critical challenges that planning authorities may face is dealing with applications perceived as premature concerning local plans or planning policies.

              The National Planning Policy Framework (NPPF) guides the limited circumstances in which it may be justified to refuse an application based on prematurity.

              Specifically, the NPPF states that this may be appropriate where the development proposed is so substantial, or its cumulative effect would be so significant, that to grant permission would undermine the plan-making process by predetermining decisions about the scale, location or phasing of new development that are central to an emerging plan.

              When considering the issue of prematurity, planning authorities must carefully assess the stage of the emerging plan, the extent to which the development would prejudice the plan, and whether the refusal of the application would have a severe impact on the ability to meet the area’s housing or other development needs.

              Authorities must also ensure that any decision to refuse on the grounds of prematurity is well-reasoned and supported by clear evidence.

              Another challenge that planning authorities may face is the need to weigh various material considerations when determining an application.

              The NPPF defines a material consideration as a matter that should be considered when deciding a planning application or on an appeal.

              These can include a wide range of factors, such as the development’s impact on the local environment, the availability of infrastructure, and the economic and social benefits of the proposal.

              What is a Material Consideration?

              A material consideration is a matter that should be considered when deciding a planning application or on an appeal.

              Material considerations can include a wide range of factors, such as the development’s impact on the local environment, the availability of infrastructure, and the economic and social benefits of the proposal.

              When there are competing or conflicting material considerations, planning authorities must carefully balance these factors and make a reasoned decision that is in the public interest.

              This may involve assigning different weights to the various considerations based on their relative importance and the specific context of the application.

              Additionally, planning authorities must maintain an impartial and objective approach, ensuring that decisions are based solely on material planning considerations and not on the level of public support or opposition.

              Planning authorities should strive to adopt a transparent and inclusive decision-making process, engaging with local communities and stakeholders throughout the application process.

              This can help build trust and understanding and ensure that all relevant perspectives are considered.

              Furthermore, planning authorities should stay up-to-date with the latest policies, legislation, and case law and seek professional advice where necessary.

              By developing a robust and well-informed approach to navigating complex and contentious planning applications, local authorities can ensure that the planning permission process remains fair, transparent, and aligned with the broader public interest.

              Delivering Net Zero: Planning Policies and Sustainable Development

              The planning permission process plays a crucial role in shaping the future of our built environment and its impact on the environment.

              As the world grapples with the urgent need to address climate change and achieve net-zero emissions, the planning system has a significant role in driving sustainable development.

              Planning authorities ensure that new developments align with the broader environmental sustainability goals and emissions reduction.

              This involves developing and implementing planning policies prioritising energy-efficient design, integrating renewable energy, and mitigating overheating risks.

              By setting clear and ambitious standards for sustainable construction, planning authorities can guide the industry towards more environmentally conscious practices, ultimately contributing to the collective effort to combat climate change.

              Overheating assessments are crucial in planning applications to ensure new developments are designed to be resilient to the impacts of a warming climate.

              Developers can incorporate design features like enhanced natural ventilation, shading, and using materials with high thermal mass to improve comfort and energy efficiency.

              Planning authorities mandate the submission of dynamic thermal modelling reports to evaluate overheating risks and outline strategies for mitigation.

              By identifying and addressing overheating risks early in the planning process, developers can reduce the need for active cooling systems and contribute to overall energy efficiency.

              Planning policies focus on driving improvements in energy efficiency through requirements like on-site renewable energy generation, low-carbon building materials, and energy-efficient technologies.

              In addition to overheating assessments, planning policies are also increasingly focused on driving improvements in energy efficiency across the built environment.

              This may include on-site renewable energy generation requirements, using low-carbon building materials, and incorporating energy-efficient technologies and appliances.

              By setting these standards, planning authorities can encourage developers to adopt a more holistic approach to sustainability, aligning their projects to achieve net-zero carbon emissions.

              As the planning system continues to evolve in response to the climate crisis, it is crucial that planning authorities stay informed and adapt their policies accordingly.

              This may involve regularly reviewing and updating local plans, engaging with industry experts, and collaborating with other stakeholders to ensure that the planning process remains fit for purpose in the face of our pressing environmental challenges.

              Conclusion: Summarizing the Key Aspects of the Planning Permission Process and Encouraging Active Engagement

              The planning permission process is complex and multifaceted, requiring a comprehensive understanding of the various stages, considerations, and stakeholders involved.

              Throughout this article, we have explored the intricacies of navigating the planning application landscape, from the initial determination of the need for permission to the pre-application stage, submission, validation, consultation, assessment, decision-making, and beyond.

              At the heart of this process lies the fundamental importance of engaging actively with the local planning authority.

              By proactively seeking guidance from the duty planner, obtaining pre-application advice, and ensuring compliance with the local information requirements, applicants can significantly improve their chances of a successful outcome.

              The validation process, emphasising completeness and compliance, underscores the need for meticulous preparation and attention to detail.

              The Importance of Engaging with Local Planning Authority

              By actively seeking guidance from the duty planner, obtaining pre-application advice, and ensuring compliance with local information requirements, applicants can improve their chances of a successful outcome.

              The validation process emphasizes completeness and compliance, underscoring the need for meticulous preparation and attention to detail.

              The consultation and notification stages are crucial, as they allow the public and stakeholders to voice their concerns and opinions, which can ultimately shape the final decision.

              The role of the case officer, who conducts the site visit and assessment, is pivotal in evaluating the proposal and formulating a recommendation.

              Considering material planning considerations and the presumption in favor of sustainable development, the decision-making process highlights the delicate balance between individual interests and the broader public good.

              The ability to navigate this process effectively while addressing challenges such as complex or contentious applications is a testament to the resilience and adaptability required.

              The planning permission process is a dynamic and evolving landscape shaped by changing policies, regulations, and societal priorities.

              By maintaining a comprehensive understanding of this process and actively engaging with the relevant stakeholders, individuals and organizations can navigate the planning system more effectively.

              Unlocking the full potential of their development proposals while contributing to the sustainable growth and betterment of their communities.

          • The Ultimate Guide to House Plans: From Planning to Building

            Building a dream home requires a lot of planning, designing, and decision-making. The first and foremost step is to have a proper house plan that meets your requirements, budget, and style. A house plan is a blueprint that outlines the layout, features, and specifications of a residential building.

            Types of House Plans

            Types of House Plans

            House plans come in various shapes, sizes, and styles, and each type has its unique features and benefits. Here are some of the most popular types of house plans:

            1. Single-Story House Plans

              Single-Story House Plans: These plans are designed for homes that have only one level. They are ideal for people who prefer a simple and straightforward layout, and they are also easier to maintain and navigate.

            2. Two-Story House Plans

              Two-Story House Plans: These plans are designed for homes that have two levels. They are perfect for people who want to maximize their living space and enjoy a more traditional and elegant style.

            3. Split-Level House Plans

              Split-Level House Plans: These plans are designed for homes that have multiple levels, with each level being slightly higher or lower than the adjacent one. They are ideal for people who want to create a unique and dynamic layout.

            4. Modern House Plans

              These plans are designed for homes that have a contemporary and minimalist style.

            5. Ranch House Plans

              Ranch House Plans: These plans are designed for homes that have a single-story layout and a casual and relaxed style.

            6. Craftsman House Plans

              Craftsman House Plans: These plans are designed for homes that have a classic and timeless style, with features such as wood trim, built-in shelves, and stone accents.

              Benefits of House Plans

              Having a proper house plan is essential for building a dream home, and it offers several benefits, including:

              1. Saves Time and Money

                Saves Time and Money: A house plan provides a clear and detailed blueprint for the construction process, which helps to minimize errors, delays, and cost overruns.

              2. Customization

                Customization: A house plan can be customized to meet your specific requirements, such as the number of bedrooms, the size of the kitchen, and the type of flooring.

              3. Compliance with Building Codes

                Compliance with Building Codes: A house plan ensures that the construction process complies with the local building codes and regulations, which is essential for obtaining permits and approvals.

              4. Visualization

                Visualization: A house plan provides a visual representation of the finished product, which helps to make design decisions and to communicate with the builders and contractors.

                How to Find the Best House Plans

                Finding the best house plan for your dream home requires some research and careful consideration. Here are some tips to help you in your search:

                1. Determine Your Needs and Budget Determine your needs and budget by considering the number of bedrooms, living space, and style. Set a budget and stick to it.

                2. Research Online Research online by visiting websites like Houseplans.com, Floorplans.com, and Family Home Plans for thousands of house plans.

                3. Check the Credentials Check the credentials of the website or designer by looking for reviews, ratings, and feedback from other customers.

                4. Consider the Location Consider the location of your dream home, taking into account factors like hurricane-prone areas and reinforced walls and windows.

                5. Consult with a Professional Consult with a professional, such as an architect or builder, for expert advice and guidance on choosing a house plan.

                  Types of house plans, their benefits, and how to find the best one for your dream home.

                6. Houseplans.com
                7. Houseplans.com

                8. Floorplans.com
                9. Floorplans.com

                10. Family Home Plans
                11. Family Home Plans

                12. Build It
                13. Build It

                14. House Plans UK
                15. House Plans UK

                16. RoomSketcher
                17. RoomSketcher

                18. Fleming Homes
                19. Fleming Homes

                20. Homeplans.com
                21. Homeplans.com

                22. Houseplansdirect.co.uk
                23. Houseplansdirect.co.uk

          • The Ultimate Guide to Architectural Drawings: Types, Purpose, and Best Practices

            Architectural drawings are an essential part of the construction process.

            They provide a visual representation of the building or structure that is to be constructed, and they communicate detailed information about the design, layout, and specifications of the project.

            What is an Architectural Drawing?

            An architectural drawing is a technical drawing that is used to communicate the design and specifications of a building or structure.

            Architects, engineers, and other construction professionals use architectural drawings to understand the project’s scope, plan the construction process, and estimate costs and budgets.

            Architectural drawings can take many forms, including sketches, plans, diagrams, and schematics.

            They are typically created according to a set of standards, such as the view, sheet size, units of measurement, and annotation and cross-referencing.

            In the past, architectural drawings were created using ink and paper, and copies were made by hand.

            However, with the development of computer-aided design (CAD) software, most architectural drawings are now created digitally, which has made the process faster, more accurate, and more efficient.

            Purpose of Architectural Drawings

            The purpose of architectural drawings is to communicate the design and layout of a building or structure to all stakeholders involved in the construction process. They are used by architects, engineers, contractors, and other construction professionals to understand the project’s scope, plan the construction process, and estimate costs and budgets.

            Architectural drawings are used to communicate the design and layout of a building or structure to all stakeholders involved in the construction process. They are used by architects, engineers, contractors, and other construction professionals to understand the project’s scope, plan the construction process, and estimate costs and budgets.

            Architectural drawings are also used to obtain building permits, zoning approvals, and other regulatory requirements. They must follow code and safety regulations, and the architectural drawings allow regulators to determine if the plans meet these standards.

            Importance of Architectural Drawings

            The importance of architectural drawings cannot be underestimated. They are a critical step in the construction process, and they provide a visual representation of the building or structure that is to be constructed. They communicate detailed information about the design, layout, and specifications of the project, and they help to ensure that all stakeholders are on the same page.

            The importance of architectural drawings cannot be underestimated. They are a critical step in the construction process, and they provide a visual representation of the building or structure that is to be constructed. They communicate detailed information about the design, layout, and specifications of the project, and they help to ensure that all stakeholders are on the same page.

            A floor plan is a two-dimensional drawing that shows the interior layout of a building.

            It includes the location of walls, doors, windows, and other architectural features, as well as the size and shape of each room.

            Floor plans are typically drawn to scale and include dimensions and annotations to provide detailed information about the design and specifications of the project.

            Floor plans are essential for understanding the flow and functionality of the building’s interior spaces.

            They are used by architects and designers to plan the layout of the building, and they are used by contractors and subcontractors to estimate costs and plan the construction process.

            Cross-Sectional Drawings

            Cross-sectional drawings are two-dimensional renderings that show the various visible and hidden elements of a building.

            They are created by slicing through the building along a vertical plane, which allows viewers to see inside the building and understand how it is constructed.

            Cross-sectional drawings are used to show the building’s structural systems, such as the foundation, framing, and roofing.

            They are also used to show the location of mechanical, electrical, and plumbing (MEP) systems, which can be challenging to visualize in three-dimensional models.

            Landscape Architectural Drawings

            Landscape architectural drawings are used to design and plan the outdoor spaces surrounding a building or structure. They may include details about the location of walkways, patios, and other hardscaping features, as well as the placement of plants, trees, and other softscaping elements.

            Landscape architectural drawings are essential for understanding the relationship between the building and the surrounding environment, and they are used by landscape architects, designers, and contractors to plan and execute the construction of the outdoor spaces.

            Elevation Drawings

            Elevation drawings are used to show the exterior of a building or structure from a specific viewpoint. They are typically drawn to scale and include dimensions and annotations to provide detailed information about the design and specifications of the project.

            Elevation drawings are essential for understanding the building’s aesthetic and functional characteristics, and they are used by architects, designers, and contractors to plan and execute the construction of the exterior facade.

            Excavation Drawings

            Excavation drawings are used to plan and execute the excavation and grading of a construction site.

            They may include details about the location and depth of trenches, pits, and other excavations, as well as the location of utilities and other infrastructure that may be affected by the excavation process.

            Excavation drawings are essential for understanding the site’s topography and the most efficient and safe way to excavate and grade the site.

            They are used by contractors, excavators, and other construction professionals to plan and execute the excavation process.

            As-Built Drawings

            As-built drawings are used to document the actual construction of a building or structure.

            They are typically created by the contractor or designer after the project is completed, and they may include details about the location and size of walls, doors, windows, and other architectural features, as well as the location of MEP systems and other infrastructure.

            As-built drawings are essential for understanding the actual construction of the building, and they are used by architects, designers, and contractors to plan and execute future renovations or additions to the building.

            Best Practices for Creating and Using Architectural Drawings

            Creating and using architectural drawings can be a complex and challenging process, but there are several best practices that can help to ensure success.

            Use Clear and Consistent Annotations

            Annotations provide detailed information about the design and specifications of a project. It is essential to use clear and consistent annotations throughout the architectural drawings to avoid confusion and misunderstandings.

            Use Standardized Symbols and Abbreviations

            Standardized symbols and abbreviations represent various architectural and engineering features in the architectural drawings. It is essential to use standardized symbols and abbreviations to ensure that all stakeholders can understand and interpret the drawings correctly.

            Use the Correct Scale

            Architectural drawings are typically drawn to scale, which means that the size of the drawing is proportional to the actual size of the building or structure. It is essential to use the correct scale to ensure that the drawings are accurate and that all stakeholders can understand the project’s scope and scale.

            Use CAD Software

            CAD software is a powerful tool for creating and managing architectural drawings. It allows for faster, more accurate, and more efficient creation of drawings, and it provides a range of tools and features for managing and collaborating on the drawings.

            CAD software is a powerful tool for creating and managing architectural drawings.

            CAD software allows for faster, more accurate, and more efficient creation of drawings.

            Use Project Management Software

            Project management software is essential for managing the construction process and ensuring that the project is completed on time and within budget.

            Project management software provides a range of tools and features for managing tasks, resources, and budgets, and it allows for real-time collaboration and communication among all stakeholders.

            ProjectManager is an award-winning project management software that provides powerful Gantt charts for organizing tasks and linking dependencies, as well as real-time dashboards and customizable reports for tracking progress and managing budgets.

            ProjectManager is an ideal tool for managing construction projects and ensuring that the architectural drawings are used effectively and efficiently.

            Conclusion

            Architectural drawings are an essential part of the construction process.

            They provide a visual representation of the building or structure to be constructed.

            They communicate detailed information about the project’s design, layout, and specifications and help ensure that all stakeholders are on the same page.

            In this Ultimate Guide, we have explored the different types of architectural drawings, their purpose and importance, and best practices for creating and using them in construction project management. By following these best practices and using powerful tools like CAD software and project management software, architects, engineers, and construction professionals can create accurate, detailed, and effective architectural drawings that help ensure the construction project’s success.
            In this Ultimate Guide, we have explored the different types of architectural drawings, their purpose and importance, and best practices for creating and using them in construction project management. By following these best practices and using powerful tools like CAD software and project management software, architects, engineers, and construction professionals can create accurate, detailed, and effective architectural drawings that help ensure the construction project’s success.

            References

            References

            • 8 Types of Architectural Drawings
            • 8 Types of Architectural Drawings8 Types of Architectural Drawings

            • Architectural Drawing Software – Draw Architecture Plans
            • Architectural Drawing Software – Draw Architecture PlansArchitectural Drawing Software – Draw Architecture Plans

            • Architecture Drawing Plans
            • Architecture Drawing PlansArchitecture Drawing Plans

            • Drawing Architecture: The beginner’s guide to drawing and painting buildings
            • Drawing Architecture: The beginner’s guide to drawing and painting buildingsDrawing Architecture: The beginner’s guide to drawing and painting buildings

            • Architecture through Drawing
            • Architecture through DrawingArchitecture through Drawing

            • Architecture Drawing Pictures, Images and Stock Photos
            • Architecture Drawing Pictures, Images and Stock PhotosArchitecture Drawing Pictures, Images and Stock Photos

            • Architecture Drawing
            • Architecture DrawingArchitecture Drawing

            • Drawing Matter
            • Drawing MatterDrawing Matter

            • Drawing Architecture: Conversations on Contemporary Practice
            • Drawing Architecture: Conversations on Contemporary PracticeDrawing Architecture: Conversations on Contemporary Practice

            • Architectural Sketches
            • Architectural SketchesArchitectural Sketches

            • The Ultimate Guide to Finding and Understanding Floor Plans for Your Property in the UK

              Essential documents for any property owner or potential buyer. They provide a detailed view of the property’s layout, including the location of doors, windows, walls, and other physical features.

              Many homeowners do not have access to their property’s floor plans, especially if they did not receive them at the time of purchase.

              Finding Floor Plans for Your Property in the UK

              Method 1: Visit Your Local Council’s Website

              Your local council’s building and planning application website is the first place to look when you want to find existing floor plans of a building.

              When undertaking building works, planning permission is often required, and a floor plan drawing is submitted as part of the application.

              Applications that have been lodged in the last 20 years can be accessed electronically on the internet, making it easy to find existing applications and subsequent floor plans.

              To see if your house has any existing planning applications/floor plan drawings, follow these steps:

            • Find your local council’s planning application website. Use Google to search for something like “Southend Planning Applications.”
            • Find your local council’s planning application website. Use Google to search for something like “Southend Planning Applications.”
            • There will be a link called or very similar to “View and Comment On Planning Applications Online.”
            • There will be a link called or very similar to “View and Comment On Planning Applications Online.”
            • Once on this page, you will find a simple search box where you can enter your postcode. Once you have done this, press “Search.”
            • Once on this page, you will find a simple search box where you can enter your postcode. Once you have done this, press “Search.”
            • This should show you a list of planning applications submitted in that area. Search through the list to see if you can find planning applications for your property.
            • This should show you a list of planning applications submitted in that area. Search through the list to see if you can find planning applications for your property.
            • Click into each application and find the “Documents” section. In here, you will find copies of the applications as well as relevant floor plan drawings.
            • Click into each application and find the “Documents” section. In here, you will find copies of the applications as well as relevant floor plan drawings.
            • Please note that older applications (generally 20 years or older) won’t have the documents scanned electronically. If the documents aren’t available online, it might be worth calling your local council and asking about visiting the archive.

              Please note that older applications (generally 20 years or older) won’t have the documents scanned electronically. If the documents aren’t available online, it might be worth calling your local council and asking about visiting the archive.

              Method 2: Use Zoopla to Find Old Estate Agent Details

              If your house has recently been purchased or sold, you may be able to find the old listing on property portals such as Zoopla. It’s always worth doing a search for your property on here, as sometimes the estate agent listing would have included a floor plan. Zoopla sometimes keeps copies of these along with the images of the property (something else that can be useful).

              The best way to search Zoopla is to use Google as they have a much better search process. Go to Google and search something like 10 Downing Street London Zoopla. This will take you to the search results where you can find your property. Click on this link on Zoopla and scroll down to Image History (if it exists). Here, you will be able to scroll through the images and hopefully find a floor plan if one exists!

              Method 3: Have a Look at the Deeds/Lease

              Sometimes consulting your property ownership documentation can yield a basic floor plan of your property. Have a look through the documents, and you may be lucky enough to find an old floor plan that can be scanned in.

              Another method is to consult the HM Land Registry website, which may show some useful information.

              However, the service only shows land boundaries rather than internal floor plans, so please bear that in mind.

              There is often a small fee to pay for this service.

              At the moment of writing, the current fees are:

            • A title register costs £3
            • A title plan costs £3
            • Method 4: Contact the Architect or Builder

              If you know the name of the architect or builder who designed or constructed your property, you may be able to contact them and request a copy of the floor plans.

              This is more likely to be successful if your property is relatively new or has undergone significant renovations in the past.

              Method 5: Hire a Professional

              If all else fails, you may need to hire a professional to create a new set of floor plans for your property.

              This can be a more expensive option, but it will ensure that you have accurate and up-to-date plans.

              There are many companies in the UK that specialize in creating floor plans for residential and commercial properties, so be sure to do your research and choose a reputable provider.

              If all else fails, you may need to hire a professional to create a new set of floor plans for your property. This can be a more expensive option, but it will ensure that you have accurate and up-to-date plans. There are many companies in the UK that specialize in creating floor plans for residential and commercial properties, so be sure to do your research and choose a reputable provider.

              Tips for Reading and Understanding Floor Plans

              Tips for Reading and Understanding Floor Plans

              Identify the Scale

              The first step in reading a floor plan is to identify the scale. The scale is usually located in the bottom right-hand corner of the plan and is represented as a ratio, such as 1:100. This means that every 1cm on the plan is equivalent to 100cm in real life. Understanding the scale is essential for accurately interpreting the sizes of rooms and other features on the plan.

              The first step in reading a floor plan is to identify the scale. The scale is usually located in the bottom right-hand corner of the plan and is represented as a ratio, such as 1:100. This means that every 1cm on the plan is equivalent to 100cm in real life. Understanding the scale is essential for accurately interpreting the sizes of rooms and other features on the plan.

              Familiarize Yourself with the Symbols

              Floor plans use a variety of symbols to represent different features and fixtures within the property. For example, a solid line may represent a wall, while a dotted line may represent a door. It’s essential to familiarize yourself with these symbols to understand the layout of the property accurately. Most floor plans will include a key or legend that explains the meaning of each symbol.

              Floor plans use a variety of symbols to represent different features and fixtures within the property. For example, a solid line may represent a wall, while a dotted line may represent a door. It’s essential to familiarize yourself with these symbols to understand the layout of the property accurately. Most floor plans will include a key or legend that explains the meaning of each symbol.

              Look for Dimensions

              Dimensions are often included on floor plans to provide a more accurate representation of the size of rooms and other features. These are usually represented as numbers followed by a unit of measurement, such as meters or feet. Be sure to look for dimensions on the plan, as they can be helpful when planning renovations or furniture layouts.

              Identify the Orientation

              The orientation of a floor plan refers to the direction that the plan is facing. This is usually represented by a North arrow or symbol located somewhere on the plan. Understanding the orientation is essential for accurately interpreting the layout of the property and the location of windows and other features.

              Pay Attention to Details

              Floor plans can include a variety of details, such as the location of electrical outlets, plumbing fixtures, and other features. Be sure to pay attention to these details, as they can be helpful when planning renovations or maintenance work.

              Conclusion

              Floor plans are essential documents for any property owner or potential buyer. They provide a detailed view of the property’s layout and can be helpful when planning renovations or maintenance work. In this Ultimate Guide, we have explored various methods for finding floor plans for your property in the UK and provided tips on how to read and understand them accurately.

              References

              References

            • How To Find Floor Plans / Blue Prints Of Your House
            • How To Find Floor Plans / Blue Prints Of Your HouseHow To Find Floor Plans / Blue Prints Of Your House

            • Property Floor Plans in London from only £30
            • Property Floor Plans in London from only £30Property Floor Plans in London from only £30

            • Professional 2D & 3D Floor Plans for Estate Agents : From £79
            • Professional 2D & 3D Floor Plans for Estate Agents : From £79Professional 2D & 3D Floor Plans for Estate Agents : From £79

            • House Plans, Floor Plans & Blueprints
            • House Plans, Floor Plans & BlueprintsHouse Plans, Floor Plans & Blueprints

            • Reading Floor Plans: A Beginner’s Guide
            • Reading Floor Plans: A Beginner’s GuideReading Floor Plans: A Beginner’s Guide