Sometimes measured building surveys can go terribly wrong. So bad that you can be faced with insolvency or unable to pay the contractor or architect to fix the problem caused by the surveyor. Here are some of the things that can go wrong: Wrong dimensions Correct...
A provisional sum is a sum of money allocated for a particular activity that is not fully defined, but it needs to be considered for a construction project. In the context of measured building survey and topographical survey an architect may request for a provisional...
A section plan is a vertical slice drawings showing the internal features of your property. It is similar to an elevation plan. However, it shows the internal features of the property. It is common to have the section plan drawn in the middle of the property’s...
A floor plan is a drawing which indicate the features of a floor for your property. In the context of a measured building survey, a floor plan consists of indicating all fixed features, as well as height information of the room, windows, doors and any beams on the...
We get over 20+ enquiries in a week, some of the time the client has no clue what they are requesting as they have been directed by their architect or a friend. Sometimes it confuses the client, and he or she ends up paying for too much or ‘quite often’ too...
Recent Comments